The Norne Gas Transport System (NGTS) connects the Norne field in the Norwegian Sea to the Åsgard Transport pipeline. The Norne Gas Transport System is 126 km long, has a diameter of 16 inches, and was put into operation in February 2001.
| From: | Norne |
|---|---|
| To: | Åsgard Transport |
| Length: | 128 |
| Diameter: | 16 |
| Technical Service Provider (TSP): | Equinor |
| Operator: | Gassco |
| Gassled: | Area H |