Europipe II transports gas from Kårstø north of Stavanger to the Europipe Receiving Facilities (ERF) at Dornum in Germany. This 42-inch pipeline is 658 km long and started up in 1999.
From: | Kårstø |
---|---|
To: | Dornum |
Length: | 658 km |
Diameter: | 42" |
Capacity: | 71.2 MSm3/d |
Technical Service Provider (TSP): | Equinor |
Operator: | Gassco |
Gassled: | Area D |