The Oseberg gas transport (OGT) pipeline connects this field with Heimdal, where the gas is split between the Vesterled line to St Fergus in Scotland and Statpipe. The latter ties into Norpipe and terminates at Emden in Germany. OGT is 109 km long and 36 inches in diameter.
From: | Oseberg |
---|---|
To: | Heimdal |
Length: | 109 km |
Diameter: | 36” |
Capacity: | 35 MSm3/d |
Technical Service Provider (TSP): | Equinor |
Operator: | Gassco |
Gassled: | Area D |