Europipe runs for 620 km from the Draupner E riser platform in the Norwegian Sea to Dornum on the German coast. The final section of this 40-inch pipeline is laid through a tunnel under the protected Wattenmeer wetlands. A 42-inch pipeline connects Dornum with the metering station at Emden, a distance of 48 km. These pipelines started up in 1995.
| Fra | Draupner E |
|---|---|
| Til | Dornum/Emden |
| Lengde | 620 km |
| Diameter | 40" |
| Technical Service Provider (TSP) | Equinor |
| Operatør | Gassco |
| Gassled | Area D |