Europipe runs for 620 km from the Draupner E riser platform in the Norwegian Sea to Dornum on the German coast. The final section of this 40-inch pipeline is laid through a tunnel under the protected Wattenmeer wetlands. A 42-inch pipeline connects Dornum with the metering station at Emden, a distance of 48 km. These pipelines started up in 1995.
From: | Draupner E |
---|---|
To: | Dornum/Emden |
Length: | 620 km |
Diameter: | 40" |
Capacity: | 45.7 MSm3/d |
Technical Service Provider (TSP): | Equinor |
Operator: | Gassco |
Gassled: | Area D |