Europipe

Europipe runs for 620 km from the Draupner E riser platform in the Norwegian Sea to Dornum on the German coast. The final section of this 40-inch pipeline is laid through a tunnel under the protected Wattenmeer wetlands.  A 42-inch pipeline connects Dornum with the metering station at Emden, a distance of 48 km. These pipelines started up in 1995.

From: Draupner E
To: Dornum/Emden
Length: 620 km
Diameter: 40"
Capacity: 45.7 MSm3/d
Technical Service Provider (TSP): Equinor
Operator: Gassco
Gassled: Area D