EMS – Emden
In Emden, quality and quantity measurement of gas is carried out at the terminal facility called Europipe Metering Station (EMS), before it is handed over downstream to transport operators.

Norsea Gas Terminal – Emden
At the Norsea Gas Terminal in Emden, pressure and temperature regulation of the gas is carried out before it passes through a facility for hydrogen sulfide (H2S) treatment. Gas measurement and quality control are performed before the gas is delivered to downstream transport operators from the terminal.

ERF – Dornum
The Europipe Receiving Terminal (ERF) receives gas from two upstream pipelines, heat up the gas,reduce the pressure, blend the gas stream. Fiscal metering of quality and volume and flow control of the delivery into the downstream NETRA system is done at ERF. Gas volumes are also routed into the 48 km long pipeline to Emden to be delivered to downstream systems at EMS.