Langeled ranks as the world’s longest underwater gas pipeline. It runs from the processing plant at Nyhamna near Kristiansund via the Sleipner field in the North Sea to the terminal at Easington in the UK – a total distance of 1 116 km. The Nyhamna-Sleipner leg is 42 inches in diameter and started up in 2007, while Sleipner-Easington is 44 inches and started up in 2006.
From: | Nyhamna |
---|---|
To: | Sleipner |
Length: | 627 km |
Diameter: | 42" |
Capacity: | 74.7 MSm3/d |
Technical Service Provider (TSP): | Equinor |
Operator: | Gassco |
Gassled: | Area D |