The Norne gas transport system (NGTS) links the Norne field in the Norwegian Sea with the Åsgard Transport pipeline. With a diameter of 16 inches, the 126-kilometre-long NGTS started up in February 2001.
From: | Norne |
---|---|
To: | Heidrun |
Length: | 128 km |
Diameter: | 16" |
Capacity: | 7.0 MSm3/d |
Technical Service Provider (TSP): | Equinor |
Operator: | Gassco |
Gassled: | Area H |